I have hermethozone, it remains to nashpigovat it with the latest technology. Let's start with electricity.
After all, where is the data center without electricity?
Directly in the room so much electricity, of course not. But there is a transformer. Cable laying at the expense of the tenant.
So, dig a ditch throughout the plant.

We bring kabeluk armored so that it lay well in the ground.
Advertising Chuvashkabel Detected

Bury. Laid, three layers on top, every half meter, a tape with the inscription "carefully cable."
')
And the ventilation grilles and materials for air ducts were brought to the containment area.

And water - freonodov. And also covered the floor so as not to make a mess of it.

Began to lay different tubes mysterious destination

I suggest black - freon, gray - condensation moisture drain, white - water intake into humidifiers.
Here and firemen arrived, brought balloons with freon. Good such fire extinguishers

And let's mount the fire extinguishing system.

Between times brought frames for air conditioners.

And here are the air conditioners themselves.

Air conditioners, of course, are license, Emerson Liebert HPM, with blowing cold air under the raised floor. A total of 60 server cabinets are planned for no more than 6 kW each (It’s not possible to cool the air anymore). Total for 360 kW of probable net power, we have 9 air conditioners of 56 kW of cold each.
Meanwhile, the fire extinguishing system completed

Put the external blocks

The picture, quite, in the spirit of steampunk.
Put control panels exhaust - pritochkoy.

They brought server cabinets and began to collect. And the inflow exhaust too.

Assembled cabinets

Knürr cabinets 42 units, 900mm deep 600mm wide. 800 mm wide cabinets are luxurious, but alas, we didn’t have enough space for 800 mm.
And here is the electricity.
Meet UPS

And electrical cabinets.

Oops Emerson Liebert, oddly enough. At 160 kVa, this is 128 kW, is also included under the N + 1 scheme and feeds the net before starting the diesel. It should be enough for 15 minutes at full load, but the diesel starts much earlier.
Put ups on the frame

That it was not boring, they did, finally, the lighting.

Rolled a bunch of wires.

And let's connect them

In order to not lose time, roll a tsiska

They made a switching cabinet and dragged optics through all the cabinets.

We look to the left

electricity hooked up.
Looking to the right, what is missing? Of course, the diesel is not enough. Sad without diesel.
Diesel rides and rides arrived

Notable beast 730 kVa. 6 pots, 2 turbines. 2 silencer. The famous Italian company oelmo. And how roars ...
All right, it's time to run all the systems.

And take beautiful photos
Type of such.

Or such

Open the site
www.webdc.ru Call the Ministry of Communications Inspector and buy furniture in the office.