How I built my data center - part three. The magic of electricity and cold

I have hermethozone, it remains to nashpigovat it with the latest technology. Let's start with electricity.
After all, where is the data center without electricity?

Directly in the room so much electricity, of course not. But there is a transformer. Cable laying at the expense of the tenant.

So, dig a ditch throughout the plant.
image

We bring kabeluk armored so that it lay well in the ground.
Advertising Chuvashkabel Detected
image
Bury. Laid, three layers on top, every half meter, a tape with the inscription "carefully cable."
')
And the ventilation grilles and materials for air ducts were brought to the containment area.
image

And water - freonodov. And also covered the floor so as not to make a mess of it.
image

Began to lay different tubes mysterious destination
image
I suggest black - freon, gray - condensation moisture drain, white - water intake into humidifiers.

Here and firemen arrived, brought balloons with freon. Good such fire extinguishers
image

And let's mount the fire extinguishing system.
image

Between times brought frames for air conditioners.
image

And here are the air conditioners themselves.
image
Air conditioners, of course, are license, Emerson Liebert HPM, with blowing cold air under the raised floor. A total of 60 server cabinets are planned for no more than 6 kW each (It’s not possible to cool the air anymore). Total for 360 kW of probable net power, we have 9 air conditioners of 56 kW of cold each.

Meanwhile, the fire extinguishing system completed image

Put the external blocks
image
The picture, quite, in the spirit of steampunk.

Put control panels exhaust - pritochkoy.
image

They brought server cabinets and began to collect. And the inflow exhaust too.
image

Assembled cabinets
image
Knürr cabinets 42 units, 900mm deep 600mm wide. 800 mm wide cabinets are luxurious, but alas, we didn’t have enough space for 800 mm.

And here is the electricity.
Meet UPS
image

And electrical cabinets.
image

Oops Emerson Liebert, oddly enough. At 160 kVa, this is 128 kW, is also included under the N + 1 scheme and feeds the net before starting the diesel. It should be enough for 15 minutes at full load, but the diesel starts much earlier.

Put ups on the frame
image

That it was not boring, they did, finally, the lighting.
image

Rolled a bunch of wires.
image

And let's connect them
image

In order to not lose time, roll a tsiska
image

They made a switching cabinet and dragged optics through all the cabinets.
image

We look to the left
image
electricity hooked up.

Looking to the right, what is missing? Of course, the diesel is not enough. Sad without diesel.
Diesel rides and rides arrived
image
Notable beast 730 kVa. 6 pots, 2 turbines. 2 silencer. The famous Italian company oelmo. And how roars ...

All right, it's time to run all the systems.
image

And take beautiful photos
Type of such.
image

Or such
image

Open the site www.webdc.ru Call the Ministry of Communications Inspector and buy furniture in the office.