Iota Bel IOOO sent for approval the
drawings of sketch projects for the construction of WiMAX base stations in the Belarusian city of Grodno
For the actual construction is still necessary:
develop project documentation;
bring equipment;
put the BS;
go through the agreement and get permission.
Chronology of the parish:
')
August 19, 2009 - arrival in Belarus is
announcedJuly 23, 2009 - permission to use frequencies in the range 2.5-2.6 GHz
October-November 2008 - registration of Iota Bel IOOO
The wait is not long, but in the meantime life :)
launched a 3G network in Minsk and regional cities