📜 ⬆️ ⬇️

Transformation approach Zachman

Good time to read, dear members habrahabr.ru

In a 2001 article Leonid Chernyak - Systems Architecture by Zahman
http://www.osp.ru/os/2001/12/180711/
is a quote:
For more than forty years, the use of technology to solve corporate problems has become something of a search for the Holy Grail.
and the architecture of Zachman is now considered an interesting search direction https://msdn.microsoft.com/ru-ru/library/ee914379.aspx

An analysis of the Zachman model for 2013 can be found at http://ailev.livejournal.com/951732.html

other approaches are published in http://www.intuit.ru/studies/courses/995/152/lecture/4236?page=2

I tried to perform the first attempt of analysis in the article http://habrahabr.ru/post/176935/ based on the terminology of the book Danilin A., Slyusarenko A. Architecture and strategy. “Yin” and “Yang” of information technology of an enterprise: Internet-Inform. Technology, 2005
')
The 6 by 6 Zachman scheme is deservedly respected, but from the point of view of tunnel modeling, it is advisable to convert it into an expandable system.

This topic offers a coordinate system for modeling an enterprise.

Time measurement is spread throughout the model from the standpoint of tunnel modeling http://habrahabr.ru/post/259291/



The upper part assumes the area of ​​the future or abstract, at the bottom - the past or concrete.

The perception of cyclical time is also recommended: product life cycle, PDCA quality management cycle, direct execution time of the Gant project, time axis for describing historical events.

Below is a diagram of the Ontology of the Zakhman enterprise with reference to the symmetric tunnel model.



It is assumed that time participates in all manifestations of the modeled area, although I will not undertake to completely deny the possibility of taking time into a separate vertical, as Zachman suggests :)



ways

purpose

activity

equipment

staff

one

future

2

logics

negation

marketstudyvotingaccounts
3

maths

function

yieldcapitalinformationdelivery
four

philosophy

Attention

Spreadcompensationmaterialscriticism

five

culture

the scienceproductsbuyersofficeethics

6

politics

training

salesprotectionproductiontransport

7

management

scenario

controlplanningdirectionsframes

eight

marketing

competition

tradesatisfactionadvertisingrecruiting

9

competition

correction

finance

repairs

accessories

service

ten

technology

competence

reliability

quality

network

design

ten

a responsibility

regulations

leadership

regulations

regulation

directorate

9

synergy

marketing

application campaign

bargaining

technology

environmental protection

eight

economic

sales

purchases

contracts

modes

insurance

7

social

reporting

distribution

control

dispatch control

social payments

6

processes

taxes

consumption

accounting


exploitation

occupational Safety and Health

five

systems


income

expenses

balance

work

staff list

four

structures

receipts

write-off

orders

technical places

workplaces

3

items


finance

warehouses

need

equipment

employees

2

messages

property

materials

plans

faults

report card


one

past


ways

purpose

activity

equipment

staff




Please evaluate the applicability of this coordinate system.



Upd. 05/25/2016 Analysis Sequence Options - Quick Analysis



Upd. 11/13/2016 - added notation for resource types



Upd. 07/21/2017 - added aspects of the enterprise in terms of levels of complexity and types of resources


Literature:



Leonid Chernyak: Systems Architecture by Zahman



A.I. Levenchuk: Zachman lived, Zachman alive, Zachman will live - version 3.0 of his approach, organizational ontology (tm)

Danilin A., Slyusarenko A. Architecture and strategy. “Yin” and “Yang” of information technology of an enterprise: Internet-Inform. Technology, 2005
Tunnel modeling - version 1.0

Source: https://habr.com/ru/post/267749/


All Articles