For more than forty years, the use of technology to solve corporate problems has become something of a search for the Holy Grail.and the architecture of Zachman is now considered an interesting search direction https://msdn.microsoft.com/ru-ru/library/ee914379.aspx
Time measurement is spread throughout the model from the standpoint of tunnel modeling http://habrahabr.ru/post/259291/
Below is a diagram of the Ontology of the Zakhman enterprise with reference to the symmetric tunnel model.
It is assumed that time participates in all manifestations of the modeled area, although I will not undertake to completely deny the possibility of taking time into a separate vertical, as Zachman suggests :)
| ways | purpose | activity | equipment | staff | ||
| one | future | |||||
| 2 | logics | negation | market | study | voting | accounts | 
| 3 | maths | function | yield | capital | information | delivery | 
| four | philosophy | Attention | Spread | compensation | materials | criticism | 
| five | culture | the science | products | buyers | office | ethics | 
| 6 | politics | training | sales | protection | production | transport | 
| 7 | management | scenario | control | planning | directions | frames | 
| eight | marketing | competition | trade | satisfaction | advertising | recruiting | 
| 9 | competition | correction | finance | repairs | accessories | service | 
| ten | technology | competence | reliability | quality | network | design | 
| ten | a responsibility | regulations | leadership | regulations | regulation | directorate | 
| 9 | synergy | marketing | application campaign | bargaining | technology | environmental protection | 
| eight | economic | sales | purchases | contracts | modes | insurance | 
| 7 | social | reporting | distribution | control | dispatch control | social payments | 
| 6 | processes | taxes | consumption | accounting | exploitation | occupational Safety and Health | 
| five | systems | income | expenses | balance | work | staff list | 
| four | structures | receipts | write-off | orders | technical places | workplaces | 
| 3 | items | finance | warehouses | need | equipment | employees | 
| 2 | messages | property | materials | plans | faults | report card | 
| one | past | |||||
| ways | purpose | activity | equipment | staff | 
Please evaluate the applicability of this coordinate system.



Literature:
Leonid Chernyak: Systems Architecture by Zahman
Source: https://habr.com/ru/post/267749/
All Articles