
So,
e-Legion has moved to a new office! But the development and refinement is still ongoing.
It is time to attach all the regalia deserved for 5 years to a prominent place (27 pcs.), But how to do it if only a ruler, a hammer, a screwdriver, a handful of screws and 5 meters of a twisted pair tool is used?
Examination of the inventory in possession showed that there was no system for accurate marking of distances, definition of horizontals and verticals. And the existing framework and certificates have the most sophisticated and non-standard mounting methods.
')
In any IT company there is:
- Free computer;
- Equipment for presentations;
- Creative staff.
How we combined this explosive mixture to achieve the goal will tell under the cut.
Go
Designers lay out all the “regalia” on a smooth horizontal surface, so-as-it-should-hang-on-wall.
Step 1 - Warping
“A look from the side of the wall” - we just turn everything upside down :)

Step 2 - Laser Targeting
To determine the attachment points insert color pins.

Step 3 - Virtualization
We translate working material into digital format using frontal shooting from under the ceiling.

Step 4 - Magic

Rule the resulting image:
- Easy color correction;
- Elimination of aberrations and distortions;
- Editing perspectives;
- Shooting at points illuminated by laser;
- Hit on the points highlighted by the laser;
- Drawing guide lines.
Step 5 - Installation
The promised laptop.

The promised projector.

The structure is mounted, connected and installed exactly opposite the target wall.

Step 6 - Prototype Testing

Step 7 - Commissioning
One of the test matrices. Tuning scale and eliminate perspective distortion.

Step 8 - Start up in production and operation
Just mark the screws screwed. We are happy if we do not get into the guide.

Result
What happened, happened. But how!

Other pictures of the process can be found
here .
Good mood to everyone on this rainy Thursday. Work with pleasure!