Engineering works
On the night from the 8th to the 9th of October 2010, technical work will be carried out on the site.

Chip and Dale may arrive at this time: this is normal. Gadget, unfortunately, will not be with them;)
')
Source: https://habr.com/ru/post/105785/
All Articles